TableS 1 - 3 Summary Tables for projects in the Spring Creek watershed, 1990-1998.
|
Table 2. Percentage of fine particles (<1mm) in stream substrates from Spring Creek, Slab Cabin Run, and Cedar Run before bank stabilization projects in 1992 and after project completion in 2007.
Year | Spring Creek | Slab Cabin Run | Cedar Run |
1992 | 5.5 | 27 | 26 |
2007 | 6.1 | 13 | 11 |
Table 3. Median concentrations of total suspended solids (TSS in mg/L) at base flow and at during storm flow prior to stream bank stabilization and after treatments in 2001-2008 in Spring Creek, the reference sub-basin and in Slab Cabin Run and Cedar Run, the treatment sub-basins |
Spring Creek | ||||
1991-1992 | 2001 | 2002 | 2007-2008 | |
Median TSS at base flow | 4 | 1.9 | 2.7 | 1 |
Sample size | 61 | 48 | 50 | 8 |
Median TSS at storm flow | 7.5 | 20 | 26 | 18.6 |
Sample size | 9 | 21 | 23 | 5 |
Slab Cabin Run | ||||
1991-1992 | 2001 | 2002 | 2007-2008 | |
Median TSS at base flow | 29.3 | 6.6 | 5.4 | 1 |
Sample size | 52 | 28 | 27 | 7 |
Median TSS at storm flow | 62.1 | 18.2 | 16.9 | 9 |
Sample size | 9 | 12 | 22 | 5 |
Cedar Run | ||||
1991-1992 | 2001 | 2002 | 2007-2008 | |
Median TSS at base flow | 17.8 | 9.8 | 11.4 | 1 |
Sample size | 62 | 48 | 48 | 8 |
Median TSS at storm flow | 29.4 | 20.6 | 33.1 | 9.7 |
Sample size | 8 | 19 | 24 | 5 |